Everything on model trains, model railroads, model railways, locomotives, model train layouts, scenery, wiring, DCC and more. Enjoy the world's best hobby... model railroading!
POLL RESULTS – Will you be working on your layout over the Christmas break?
Our last poll ran for only a few days and asked: Will you be working on your layout over the Christmas break?
There were 323 respondents and the votes were as follows:
>> YES – I hope to (72%, 233 Votes)
>> No – Unfortunately I have other things to do (16%, 53 Votes)
>> I don’t have a layout yet (12%, 37 Votes)
Add your comment.
One Response to POLL RESULTS – Will you be working on your layout over the Christmas break?
Leave a Reply
It doesn’t matter that I was not in the Poll, I have been working on the layout every chance I have had through Christmas and into New Years. Running trains for a while, Fixing a switch, Helping a friend code their engine address for DCC. and tonight installing a manual switch lever to a track switch using a 3 way electric switch and box I found in one of the latest Model Railroad magazines. I have installed 2 and tonight installing my third. These are working with very positive results and by using s 3 way electric switch I can use the terminals to hook up dwarf lights or panel lights to tell which way the switch is thrown especially hidden switches. The switches have already had wire leads installed and I can later hook up the lights. Happy New Year Fellow Railroaders from Newman