Everything on model trains, model railroads, model railways, locomotives, model train layouts, scenery, wiring, DCC and more. Enjoy the world's best hobby... model railroading!

background buildings model trains

How Do You Remove Ballast and Flex Track?

Roy asks readers:

“Is there a way to remove ballast and flex track? I want to replace flex track with Kato track.”

Unfortunately Roy doesn’t give any details of how his track and ballast are applied on his N scale layout. Hopefully he will add a comment to this post giving more detail.

4 Responses to How Do You Remove Ballast and Flex Track?

  • Newman Atkinson says:

    Partly it depends on what all had been used to lay the track. Some used nails and some used glue. and others used both. I no longer use either. I use apex clear caulking and all you have to do is slide a knife under the rail and or road bed. sometimes just a putty knife. Pulling track with nails I use a pair of side cuts (dykes) and grab the head of the nail with the tip of the cutters and laying them across one of the rails I pry the nail out then use the knife and make several passes and work your way across under the ties. Then do the same with the roadbed. Depends on the glues. As far and the road bed rock let it come up with the rail and work on cleaning it up after the track is removed. My experience the best way to lay track now a days is use the apex clear caulking and after it sets about 15 minutes it will hold itself. But if you make a mistake or change your track plans later it is easy to get it back up Even road bed comes up without much tearing. Try not to pry on your track as you will just bend it and ruin it for future use.
    from Newman

    • alan says:

      Warm soap water will help put don’t put loads on at once you will find it very easy to scrap it will a small knife

  • Richard says:

    Depends how you fixed the track originally. I use only Cold Glue (Wood Glue) with a fixing nail occasionally. Wet a cloth or towel and lay it on the track you wish to lift. Leave it for awhile. Or, you can also run water through a dropper along the track. Leave for a while. Carefully lift the track and remember those nails. Remove them with cutters as you lift. Lay the loose track in a bath of warm water. They will come out spanking new (if you used Cold Glue).

  • BobT says:

    If the track and/or ballast has been glued down with a PVA adhesive use 50/50 Methylated Spirit and water. Brush on a good amount and leave for a few minutes and it should then lift with a scraper against the base board and without damage. If doesn’t work first time re apply again. Good luck.

Leave a Reply

Your email address will not be published. Required fields are marked *

Add a photo or image related to your comment (JPEG only)

SUBMIT YOUR QUESTION

scale model building stores
scale model building yard freight office
low relief yard railways
scale model building tall background

Download Your Free Catalog

wild west town model

Use Tiny Railroad Micro Controllers

scale model building house

Model Train Help Ebook

Model Railroading Blog Archive

Reader Poll

Sorry, there are no polls available at the moment.